Editorial summary

The company seeks a QA/QC Manager to lead Quality Assurance and Quality Control across major data centre building construction projects. The role is with a leading A1 main contractor in Singapore, overseeing QA/QC delivery for data centre, industrial, and commercial building projects. The ideal candidate will have experience leading QA/QC on large-scale construction projects, with responsibilities spanning quality systems, site inspections, and compliance. The position offers a competitive base salary up to SGD 12,000 plus AWS, performance bonus, various allowances, and comprehensive benefits.

This summary is AI-generated and may contain inaccuracies. Please refer to the full job description below.

Job description

[This job https://singapore.job-q.com/jobs/detail/qa-qc-manager-data-centre-construction-projects-37321 first appeared in Job-Q.com on 11 Oct 2026]

Lead Quality Assurance & Quality Control Across Major Data Centre Building Construction Projects

Company: Leading A1 Main Contractor

Position: QA/QC Manager

Working Week: Monday – Friday, 5 Days per Week

Salary: Upto SGD 12,000 (Commensurate with Experience)

Project Types: Data Centre | Industrial | Commercial Buildings

Project Location: Singapore

COMPENSATION & BENEFITS 

Salary Package: Competitive Base Salary + AWS + Performance Bonus + Manager Allowance + Site Allowance + Travel Allowance

Benefits: Training & Career Development + Medical & Dental Insurance + Other Attractive Employee Benefits

ABOUT THE OPPORTUNITY 

We are partnering with a leading Japanese A1 Main Contractor delivering major building projects across Singapore. We are seeking an experienced QA/QC Manager to lead quality assurance and quality control activities across large-scale Residential, Commercial and Mixed-Use developments, ensuring construction works meet project, contractual and quality requirements. 

ROLE & RESPONSIBILITIES 

  • Lead and manage Quality Assurance and Quality Control (QA/QC) activities throughout the construction lifecycle of major Data Centre building projects.
  • Develop, implement and monitor Project Quality Plans (PQP), Inspection and Test Plans (ITP), quality procedures and inspection schedules.
  • Oversee quality inspections across Civil & Structural, Architectural and M&E works, ensuring compliance with approved drawings, specifications and project requirements.
  • Manage non-conformance reports (NCR), corrective and preventive actions, quality audits and defect rectification, ensuring timely resolution.
  • Coordinate with clients, consultants, subcontractors and project teams on quality inspections, material approvals, testing and project quality deliverables.
  • Lead and supervise the QA/QC team, maintaining quality documentation, inspection records, audit reports and handover requirements.

REQUIREMENTS 

  • Bachelor's Degree in Civil Engineering, Mechanical Engineering, Electrical Engineering, Construction Management or equivalent.
  • Minimum 8 years of relevant construction QA/QC experience, including experience managing quality systems on major building projects.
  • Strong experience in Data Centre, Industrial or large-scale Commercial building construction, preferably with an A1/Main Contractor in Singapore.
  • Good knowledge of QA/QC procedures, Project Quality Plans, Inspection and Test Plans, quality audits, NCR management and construction inspections.
  • Familiarity with ISO 9001 Quality Management Systems, Singapore construction standards and multidisciplinary C&S, Architectural and M&E quality requirements.
  • Strong leadership, technical coordination and problem-solving capabilities, with experience managing QA/QC teams, subcontractors and project stakeholders.

CAREER PROSPECT 

An excellent opportunity to join a leading A1 Main Contractor delivering major Data Centre building construction projects in Singapore, offering long-term career stability, exposure to technically complex developments and strong career progression towards Senior QA/QC Manager and Head of Quality positions.

For more information, please contact Banen Associates or simply click APPLY, and we will get in touch with you.

Email: email address

WhatsApp: +65 9810 0904

Applicants are encouraged to apply directly through MyCareersFuture.

Scam prevention reminder: You should not make any pre-payment when applying for any job.

Illegal practices reminder: It is illegal for recruiter to collect payment (kickback) from the worker https://www.mom.gov.sg/-/media/mom/documents/publications/foreign-workers/what-are-kickbacks.pdf

Login is optional, you may send application via email

Login to Save Login to Apply

Get AI to assess your suitability to this job

Assess My Fit with AI Beta — Free during trial period

Login to upload your resume and get an instant match score, strengths, and gaps.


Or use your preferred AI chat tool manually:

Use AI chat of your choice: ChatGPT, Gemini, Claude — and:

  1. Paste this into the prompt:
    I am a jobseeker. Below is a job posting. Please: 1. Give a match score (0–100) based on my resume vs the job requirements 2. List my 3–5 key strengths that align with this role 3. List 2–3 areas to improve or gaps to address before applying 4. Give a one-sentence verdict: should I apply, apply with adjustments, or skip? Job posting URL: https://singapore.job-q.com/jobs/detail/qa-qc-manager-data-centre-construction-projects-37321 After reading the job, ask me to upload or paste my resume.
  2. Upload your resume in the same chat.

Similar Jobs

Building Executive (Commercial/Office Building)

Oversee the day-to-day operations and upkeep of a commercial office building, conducting...

On site

Full Time

RECRUIT EXPERT PTE. LTD.

M&E Engineer (Commercial/Office Building)

Manage and supervise M&E technicians in the daily operation, troubleshooting and maintenance...

On site

Full Time

RECRUIT EXPERT PTE. LTD.

Job Summary

  • Published on: 11 Oct, 2026
  • Category: Building & Construction
  • Vacancy: 1
  • Job type: Permanent
  • Salary: 12000
  • Location: On site
  • Job Nature: Permanent

Company Details